Our Solutions
A Bespoke Game Plan for Data Center and Mission Critical Facilities
X-Wavetech’s team of experts optimize the planning, design, delivery of data center reconfiguration, upgrade, and new facility projects. We determine project requirements and develop optimum mission-critical facility design concepts in tandem with a budget that meets business goals.
-
While data center fit-out historically requires adherence to pressured timelines, the overall industry generally seems resigned to lack agility and poor execution. Cage solutions often lack the completeness of a proper solution instead of “checking a box,” at best. Containment often struggles to support the various implementation criteria differentiating each data center, let alone each client deployment.
The X-Wavetech Fit-Out Efficiency Platform evolved true Cage and Containment Solutions capable of meeting deadlines. The platform is built on the following criteria:
· Customization
· Speed to Delivery
· Any Specifications
· Adaptable
-
Cage solutions range from simple to complex with the complex requirements involving custom engineering and development. X-Wavetech specializes in rapidly gathering the details needed to support the client needs, expediting custom engineering, and delivering/installing solutions faster than virtually any other organization can even order materials.
The reality of ensuring the delivery of a cage solution into a unique space and environment, because no one cage solution equals another, takes a deep understanding of all facets of the data center, the operations of the facility, and the expectations of the client, all foundational components of X-Wavetech’s business.
X-Wavetech Can Handle Any Size Project in Any Environment.
From right-of-way buildings to site civil, we can provide solutions for all buildings large and small. As communication and data center businesses rapidly evolve, X-Wavetech is committed to supporting your company’s expansion demands. While craftsmanship and value are our passion, safety always remains our top focus.
When (Almost) Everything Goes Wrong! A True Story
Despite delivering the required cage solution two weeks early, a colocation client decided to violate the entire structural integrity of the cage by introducing a 30% net-new lineal hanging load from the cage structure without informing X-Wavetech. The resulting load caused the cage roof to bow inward and compromised the weight-bearing integrity of the column posts. Despite entire liability applying to the colocation company, X-Wavetech went to work.